Connect with IHI
IHI on Facebook IHI on Twitter IHI on LinkedIn
View FMEA Tool Workspace
This page shows the FMEA Tool Report created by a specific organization or individual — including (in a separate browser window) the detailed FMEA that outlines the steps in the process; the failure modes, causes, and effects for each step; and the Risk Priority Number (RPN) for each step, each associated failure mode, and the entire process. In addition, the graph tracks the RPN for the process over time to see if the changes you are making are leading to improvement.

Does this process look like yours? You can use it as the basis for creating your own FMEA!
 
Long Bone Fracture Pan Management in the ED

Mercy Medical Center Mt Shasta
Mt. Shasta, California, United States
Hospital-Community

 

Aim: Reduce mean time of pain medication administration to patients with suspected long-bone fractures from 87 minutes to less than or equal to 60 minutes of arrival



View the Original Process (will appear in a new window)