Connect with IHI
IHI on Facebook IHI on Twitter IHI on LinkedIn
View FMEA Tool Workspace
This page shows the FMEA Tool Report created by a specific organization or individual — including (in a separate browser window) the detailed FMEA that outlines the steps in the process; the failure modes, causes, and effects for each step; and the Risk Priority Number (RPN) for each step, each associated failure mode, and the entire process. In addition, the graph tracks the RPN for the process over time to see if the changes you are making are leading to improvement.

Does this process look like yours? You can use it as the basis for creating your own FMEA!
 
Reduce the Potential for Child Abduction in PEC Al

Hamad Medical Corporation
Doha, Qatar
Hospital-Teaching

 

Aim: Reduce the risk of pediatric abduction from PEC Al saad facility Reduce Risk Priority Number by 75% in 12 months.



View the Original Process (will appear in a new window)

View the Most Recent Process (will appear in a new window)



Annotations
1 installed CCTV within the unit.Public access to exit doors is limited and provided only one designated access for the patients and visitors. Security guards at the entrance/exit doors stationed.Developed printed education pamphlets on child safety Child