Connect with IHI
IHI on Facebook IHI on Twitter IHI on LinkedIn
View FMEA Tool Workspace
This page shows the FMEA Tool Report created by a specific organization or individual — including (in a separate browser window) the detailed FMEA that outlines the steps in the process; the failure modes, causes, and effects for each step; and the Risk Priority Number (RPN) for each step, each associated failure mode, and the entire process. In addition, the graph tracks the RPN for the process over time to see if the changes you are making are leading to improvement.

Does this process look like yours? You can use it as the basis for creating your own FMEA!
 
Copy of Equipment Inventory Control 2007 FMEA (a)

Hillcrest Health Systems
Waco, Texas, United States
Hospital-Community

 

Aim: 1) Control inventory of targeted clinical equipment tha results in the optimum equipment availability and operability
2) Reduce monthly inventory of unaccounted for equipment by 50% within three months of implementing the corrective action plan.




View the Original Process (will appear in a new window)

View the Most Recent Process (will appear in a new window)