Connect with IHI
IHI on Facebook IHI on Twitter IHI on LinkedIn
View FMEA Tool Workspace
This page shows the FMEA Tool Report created by a specific organization or individual — including (in a separate browser window) the detailed FMEA that outlines the steps in the process; the failure modes, causes, and effects for each step; and the Risk Priority Number (RPN) for each step, each associated failure mode, and the entire process. In addition, the graph tracks the RPN for the process over time to see if the changes you are making are leading to improvement.

Does this process look like yours? You can use it as the basis for creating your own FMEA!
 
EKL smart pump roll-out

LSU/HSC
Baton Rouge, Louisiana, United States
Hospital-Teaching

 

Aim: 1. to evaluate all actual or potiential safety hazards related to the use of alaris smart pumps which include iv modules, pca modules and syringe pumps modules.

2. ensure that staff is adequately trained and competent to use of alaris pump system before roll out begins

3. continuous evaluati




View the Original Process (will appear in a new window)